United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 575, Okeechobee County
Solar project 575, Okeechobee County is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, in Okeechobee County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 575
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- State Road 70
- Location
- Okeechobee County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 25 July 2023
- Proposed online date
- January 2028
Location
Marker shows the centre of Okeechobee County; the queue data does not give exact sites.
Other requests in Okeechobee County
- Solar project 405, Okeechobee CountySolar Β· 74.5 MW Β· in study
- Solar project 281, Okeechobee CountySolar Β· 74.5 MW Β· built
- Solar project 301, Okeechobee CountySolar Β· 74.5 MW Β· built
- Solar project 168Solar Β· 74.5 MW Β· built
- Solar project 282, Okeechobee CountySolar Β· 74.5 MW Β· built
- Solar project 400, Okeechobee CountySolar Β· 74.5 MW Β· built
- Battery storage project 623, Okeechobee CountyBattery storage Β· 400 MW Β· withdrawn
- Solar project 589, Okeechobee CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 590, Okeechobee CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 578, Okeechobee CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 581, Okeechobee CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 481, Okeechobee CountySolar Β· 74.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem