BATTERY STORAGE Β· NYISOThe Bruckner
The Bruckner is a 11.6 MW battery storage request withdrawn in the NYISO interconnection queue, in Bronx County, New York, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2021 (completed)
- Withdrawn / abandonedNov 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1269
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- 174 Power Global Properties, LLC
- Location
- Bronx County, New York
- Technology
- Battery: 11.6 MW
- Total requested
- 11.6 MW
- Queue status
- Withdrawn
- Entered queue
- 28 September 2021
- Withdrawn
- November 2021
Location
Marker shows the centre of Bronx County; the queue data does not give exact sites.
Other requests in Bronx County
- Blue Spruce StorageBattery storage Β· 300 MW Β· in study
- Palladium StorageBattery storage Β· 140 MW Β· in study
- Port Morris Energy StorageBattery storage Β· 130 MW Β· in study
- South Bronx Energy StorageBattery storage Β· 100 MW Β· in study
- Hell Gate Energy StorageBattery storage Β· 90.0 MW Β· in study
- NY Wind - Mott Haven CSRWind + storage Β· 1,400 MW Β· withdrawn
- NY Wind - Mott HavenOffshore wind Β· 1,272 MW Β· withdrawn
- Oak Point YardGas Β· 500 MW Β· withdrawn
- Tremont BESSBattery storage Β· 300 MW Β· withdrawn
- Bronx Shores Energy StorageBattery storage Β· 300 MW Β· withdrawn
- Palladium StorageBattery storage Β· 255 MW Β· withdrawn
- Blue Spruce StorageBattery storage Β· 245 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem