πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

SOLAR Β· PJM

Solar project AH1-380, Worcester County

Solar project AH1-380, Worcester County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Worcester County, Maryland, connecting to DPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2025 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-380
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DPL
Developer
Forest Lane Solar, LLC
Connection point (POI)
Mt Olive - Kenny 69kV
Location
Worcester County, Maryland
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
26 February 2025
Proposed online date
December 2024
Withdrawn
December 2025

Location

Marker shows the centre of Worcester County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Worcester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem