United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR + STORAGE Β· SOUTHEASTSolar + storage project 354, Putnam County
Solar + storage project 354, Putnam County is a 74.5 MW solar + storage request withdrawn in the Southeast interconnection queue, in Putnam County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 354
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- Third Party
- Connection point (POI)
- Rice Sub
- Location
- Putnam County, Florida
- Technology
- Solar: 74.5 MW Β· Battery
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- IA Executed
- Queue status
- Withdrawn
- Entered queue
- 30 July 2018
- Proposed online date
- December 2023
Location
Marker shows the centre of Putnam County; the queue data does not give exact sites.
Other requests in Putnam County
- Battery storage project 615, Putnam CountyBattery storage Β· 200 MW Β· in study
- Solar project 398, Putnam CountySolar Β· 74.5 MW Β· in study
- Solar project 370, Putnam CountySolar Β· 74.9 MW Β· built
- Solar project 350, Putnam CountySolar Β· 74.5 MW Β· built
- Solar project 351, Putnam CountySolar Β· 74.5 MW Β· built
- Solar project 183Solar Β· 74.5 MW Β· built
- Solar project 265, Putnam CountySolar Β· 74.5 MW Β· built
- Battery storage project 616, Putnam CountyBattery storage Β· 100 MW Β· withdrawn
- Solar project 348, Putnam CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 327, Putnam CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 254, Putnam CountySolar Β· 35.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem