United States βΊ Grid βΊ Interconnection queues βΊ Florida
SOLAR Β· SOUTHEASTSolar project 470, Desoto County
Solar project 470, Desoto County is a 74.5 MW solar request withdrawn in the Southeast interconnection queue, in Desoto County, Florida, connecting to Florida Power & Light.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2022 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 470
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Florida Power & Light
- Developer
- FPL
- Connection point (POI)
- Whidden Sub
- Location
- Desoto County, Florida
- Technology
- Solar: 74.5 MW
- Total requested
- 74.5 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 20 July 2022
- Proposed online date
- January 2027
Location
Marker shows the centre of Desoto County; the queue data does not give exact sites.
Other requests in Desoto County
- Solar project 605, Desoto CountySolar Β· 74.9 MW Β· in study
- Solar project 604, Desoto CountySolar Β· 74.9 MW Β· in study
- Solar project 473, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 413, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 475, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 434, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 430, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 471, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 521, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 429, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 476, Desoto CountySolar Β· 74.5 MW Β· in study
- Solar project 477, Desoto CountySolar Β· 74.5 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem