SOLAR Β· PJMSolar project AH1-113, Brown County
Solar project AH1-113, Brown County is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Brown County, Ohio, connecting to DEOK.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedDec 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-113
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DEOK
- Connection point (POI)
- North Pole - Russelville 34.5 kV
- Location
- Brown County, Ohio
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 August 2021
- Proposed online date
- July 2023
- Withdrawn
- December 2024
Location
Marker shows the centre of Brown County; the queue data does not give exact sites.
Other requests in Brown County
- Hillcrest Solar FacilitySolar Β· 125 MW Β· built
- Hillcrest Solar FacilitySolar Β· 75.0 MW Β· built
- Stuart Electric Generating StationCoal Β· 20.5 MW Β· built
- Bio Energy Landfill FacilityOther Β· 4.8 MW Β· built
- Solar project AH1-273, Brown CountySolar Β· 160 MW Β· withdrawn
- Battery storage project AG2-359, Brown CountyBattery storage Β· 125 MW Β· withdrawn
- Solar project AC1-022, Brown CountySolar Β· 60.0 MW Β· withdrawn
- Solar project AC2-062, Brown CountySolar Β· 55.0 MW Β· withdrawn
- Solar project AA1-126, Brown CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AA1-125, Brown CountySolar Β· 20.0 MW Β· withdrawn
- Solar project AH1-114, Brown CountySolar Β· 20.0 MW Β· withdrawn
- Solar project W3-098, Brown CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem