United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMThomas Ridge Solar
Thomas Ridge Solar is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Snyder County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2019 (completed)
- Withdrawn / abandonedJan 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE2-111
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- Beavertown Tap-Beavertown Weaving Tap 69kV
- Location
- Snyder County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 1 March 2019
- Proposed online date
- December 2024
- Withdrawn
- January 2023
Location
Marker shows the centre of Snyder County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Snyder County
- Washington West SolarSolar + storage Β· 40.0 MW Β· agreement signed
- Washington East SolarSolar + storage Β· 20.0 MW Β· agreement signed
- Sunbury Generation FacilityGas Β· 416 MW Β· built
- Sunbury Generation FacilityGas Β· 381 MW Β· built
- Sunbury Generation FacilityGas Β· 227 MW Β· built
- Sunbury Generation FacilityGas Β· 97.0 MW Β· built
- Penn Solar (Cottontail 6)Solar Β· 20.0 MW Β· built
- Sunbury #1Coal Β· 10.0 MW Β· built
- Sunbury #1Coal Β· 10.0 MW Β· built
- Gas project AA2-182, Snyder CountyGas Β· 1,030 MW Β· withdrawn
- Coal project R04, Snyder CountyCoal Β· 817 MW Β· withdrawn
- Gas project AF1-235, Snyder CountyGas Β· 617 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem