United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J952, Corson County
Onshore wind project J952, Corson County is a 54.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Corson County, South Dakota, connecting to MONTANA-DAKOTA UTILITIES CO..
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2018 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J952
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- MONTANA-DAKOTA UTILITIES CO.
- Connection point (POI)
- McLaughlin - McIntosh Junction 115 kV Line Tap
- Location
- Corson County, South Dakota
- Technology
- Wind: 54.0 MW
- Total requested
- 54.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 5 February 2018
- Proposed online date
- September 2022
- Withdrawn
- March 2021
Location
Marker shows the centre of Corson County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Corson County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem