United States βΊ Grid βΊ Interconnection queues βΊ Utah
GAS Β· WESTGas project 423, Salt Lake County
Gas project 423, Salt Lake County is a 230 MW gas request withdrawn in the West interconnection queue, in Salt Lake County, Utah, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2012 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 423
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Oquirrh substation
- Location
- Salt Lake County, Utah
- Technology
- Gas: 230 MW
- Total requested
- 230 MW
- Service type
- Network resource (NRIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 16 April 2012
- Proposed online date
- May 2015
Location
Marker shows the centre of Salt Lake County; the queue data does not give exact sites.
Other requests in Salt Lake County
- Battery storage project C2-10, Salt Lake CountyBattery storage Β· 500 MW Β· agreement signed
- Battery storage project C2-28, Salt Lake CountyBattery storage Β· 199 MW Β· agreement signed
- Battery storage project PIS087, Salt Lake CountyBattery storage Β· 500 MW Β· in study
- Battery storage project T2-084, Salt Lake CountyBattery storage Β· 500 MW Β· in study
- Battery storage project T2-061, Salt Lake CountyBattery storage Β· 225 MW Β· in study
- Battery storage project PIS088, Salt Lake CountyBattery storage Β· 199 MW Β· in study
- Battery storage project T2-080, Salt Lake CountyBattery storage Β· 160 MW Β· in study
- Gas project PIS091, Salt Lake CountyGas Β· 17.0 MW Β· in study
- Gas project T2-015, Salt Lake CountyGas Β· 7.0 MW Β· in study
- Wind + storage project C1-04, Salt Lake CountyWind + storage Β· 6.0 MW Β· in study
- Onshore wind project C1-58, Salt Lake CountyOnshore wind Β· 2.0 MW Β· in study
- Battery storage project TCS-48, Salt Lake CountyBattery storage Β· 200 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem