United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
SOLAR Β· MISOSolar project J905, Pipestone County
Solar project J905, Pipestone County is a 40.0 MW solar request withdrawn in the MISO interconnection queue, in Pipestone County, Minnesota, connecting to NORTHERN STATES POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedJan 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J905
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- NORTHERN STATES POWER COMPANY
- Connection point (POI)
- Buffalo Ridge 115kV Substation
- Location
- Pipestone County, Minnesota
- Technology
- Solar: 40.0 MW
- Total requested
- 40.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- September 2020
- Withdrawn
- January 2021
Location
Marker shows the centre of Pipestone County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Pipestone County
- Onshore wind project G621, Pipestone CountyOnshore wind Β· 20.0 MW Β· agreement signed
- Onshore wind project G081, Pipestone CountyOnshore wind Β· 1.0 MW Β· agreement signed
- Solar project J1620, Pipestone CountySolar Β· 125 MW Β· in study
- Onshore wind project J426, Pipestone CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project J558, Pipestone CountyOnshore wind Β· 9.2 MW Β· built
- Onshore wind project G285, Pipestone CountyOnshore wind Β· 9.0 MW Β· built
- Onshore wind project G278, Pipestone CountyOnshore wind Β· 8.0 MW Β· built
- Onshore wind project G382, Pipestone CountyOnshore wind Β· 8.0 MW Β· built
- Onshore wind project G397, Pipestone CountyOnshore wind Β· 5.0 MW Β· built
- Onshore wind project G185, Pipestone CountyOnshore wind Β· 4.0 MW Β· built
- Onshore wind project G041, Pipestone CountyOnshore wind Β· 2.0 MW Β· built
- Onshore wind project G398, Pipestone CountyOnshore wind Β· 2.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem