SOLAR Β· PJMTitusville Solar
Titusville Solar is a 20.0 MW solar request withdrawn in the PJM interconnection queue, in Venango County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2018 (completed)
- Withdrawn / abandonedApr 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AE1-160
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Venango 34.5 kV
- Location
- Venango County, Pennsylvania
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 25 September 2018
- Proposed online date
- December 2024
- Withdrawn
- April 2024
Location
Marker shows the centre of Venango County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Venango County
- Battery storage project AI1-181, Venango CountyBattery storage Β· 140 MW Β· in study
- Solar + storage project AG2-420, Venango CountySolar + storage Β· 25.0 MW Β· in study
- Solar project AI2-310, Venango CountySolar Β· 7.3 MW Β· in study
- Solar project AI2-057, Venango CountySolar Β· 6.6 MW Β· in study
- Solar project AI2-312, Venango CountySolar Β· 5.5 MW Β· in study
- Handsome LakeGas Β· 20.0 MW Β· built
- Cardinal SolarSolar Β· 18.9 MW Β· built
- Gas project AA1-045, Venango CountyGas Β· 308 MW Β· withdrawn
- Gas project B43, Venango CountyGas Β· 284 MW Β· withdrawn
- Solar + storage project AF1-304, Venango CountySolar + storage Β· 100 MW Β· withdrawn
- Solar project AE1-169, Venango CountySolar Β· 85.0 MW Β· withdrawn
- Solar project AF2-164, Venango CountySolar Β· 80.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem