BATTERY STORAGE Β· WEST

Battery storage project 41, Whatcom County

Battery storage project 41, Whatcom County is a 2.0 MW battery storage request withdrawn in the West interconnection queue, in Whatcom County, Washington, connecting to Puget Sound Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jan 2015 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
41
Grid region
West (non-ISO utilities)
Utility / transmission owner
Puget Sound Energy
Connection point (POI)
Glacier 12
Location
Whatcom County, Washington
Technology
Battery: 2.0 MW
Total requested
2.0 MW
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
12 January 2015
Proposed online date
December 2015

Location

Marker shows the centre of Whatcom County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Whatcom County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem