GAS Β· WESTUS Elect Power Corp
US Elect Power Corp is a 349 MW gas request withdrawn in the West interconnection queue, in Whatcom County, Washington, connecting to US Electric Power Corporation.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G64
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- US Electric Power Corporation
- Developer
- US Electric Power Corporation
- Connection point (POI)
- Interconnection at 230 kV Customer Substation
- Location
- Whatcom County, Washington
- Technology
- Gas: 349 MW
- Total requested
- 349 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 21 June 2001
- Proposed online date
- March 2004
Location
Marker shows the centre of Whatcom County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Whatcom County
- Battery storage project 86, Whatcom CountyBattery storage Β· 100 MW Β· agreement signed
- Battery storage project 149, Whatcom CountyBattery storage Β· 200 MW Β· in study
- Gas project 152, Whatcom CountyGas Β· 188 MW Β· in study
- Battery storage project 145, Whatcom CountyBattery storage Β· 100 MW Β· in study
- Gas project 37, Whatcom CountyGas Β· 40.0 MW Β· built
- Other project 18, Whatcom CountyOther Β· 0.6 MW Β· built
- Competitive Power VentureGas Β· 1,300 MW Β· withdrawn
- Cherry Point RefineryGas Β· 1,000 MW Β· withdrawn
- Gas project 9, Whatcom CountyGas Β· 610 MW Β· withdrawn
- 500MW Custer-[Intalco,Portal Way] 1Gas Β· 500 MW Β· withdrawn
- 500MW Custer-[Intalco,Portal Way] 2Gas Β· 500 MW Β· withdrawn
- Battery storage project 104, Whatcom CountyBattery storage Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem