United States › Grid › Interconnection queues › Washington
GAS · WEST500MW Custer-[Intalco,Portal Way] 1
500MW Custer-[Intalco,Portal Way] 1 is a 500 MW gas request withdrawn in the West interconnection queue, in Whatcom County, Washington, connecting to Calpine Energy Services, L.P..
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2001 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G24
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Calpine Energy Services, L.P.
- Developer
- Calpine Energy Services, L.P.
- Connection point (POI)
- Custer-Intalco/Portal Way 230 kV transmission line
- Location
- Whatcom County, Washington
- Technology
- Gas: 500 MW
- Total requested
- 500 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 15 February 2001
- Proposed online date
- June 2005
Location
Marker shows the centre of Whatcom County; the queue data does not give exact sites.
Power plants in Washington · Transmission lines in Washington
Other requests in Whatcom County
- Battery storage project 86, Whatcom CountyBattery storage · 100 MW · agreement signed
- Battery storage project 149, Whatcom CountyBattery storage · 200 MW · in study
- Gas project 152, Whatcom CountyGas · 188 MW · in study
- Battery storage project 145, Whatcom CountyBattery storage · 100 MW · in study
- Gas project 37, Whatcom CountyGas · 40.0 MW · built
- Other project 18, Whatcom CountyOther · 0.6 MW · built
- Competitive Power VentureGas · 1,300 MW · withdrawn
- Cherry Point RefineryGas · 1,000 MW · withdrawn
- Gas project 9, Whatcom CountyGas · 610 MW · withdrawn
- 500MW Custer-[Intalco,Portal Way] 2Gas · 500 MW · withdrawn
- US Elect Power CorpGas · 349 MW · withdrawn
- Battery storage project 104, Whatcom CountyBattery storage · 200 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem