United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· SPP

Onshore wind project GEN-2020-018, Sully County

Onshore wind project GEN-2020-018, Sully County is a 205 MW onshore wind request withdrawn in the SPP interconnection queue, in Sully County, South Dakota, connecting to BEPC.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2020 (completed)
  2. Withdrawn / abandonedDec 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2020-018
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
BEPC
Connection point (POI)
Leland Olds-Ft. Thompson 345 kV
Location
Sully County, South Dakota
Technology
Wind: 205 MW
Total requested
205 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
28 April 2020
Proposed online date
August 2026
Withdrawn
December 2022

Location

Marker shows the centre of Sully County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem