United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· SPPOnshore wind project GEN-2020-018, Sully County
Onshore wind project GEN-2020-018, Sully County is a 205 MW onshore wind request withdrawn in the SPP interconnection queue, in Sully County, South Dakota, connecting to BEPC.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2020 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2020-018
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- BEPC
- Connection point (POI)
- Leland Olds-Ft. Thompson 345 kV
- Location
- Sully County, South Dakota
- Technology
- Wind: 205 MW
- Total requested
- 205 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 28 April 2020
- Proposed online date
- August 2026
- Withdrawn
- December 2022
Location
Marker shows the centre of Sully County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem