United States βΊ Grid βΊ Interconnection queues βΊ Missouri
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2024-064, Dade County
Solar + storage project GEN-2024-064, Dade County is a 185 MW solar + storage request withdrawn in the SPP interconnection queue, in Dade County, Missouri, connecting to EDE.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2024 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2024-064
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- EDE
- Connection point (POI)
- Dadeville - Chesapeake 161 kV line
- Location
- Dade County, Missouri
- Technology
- Solar: 185 MW Β· Battery
- Total requested
- 185 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 30 October 2024
- Proposed online date
- August 2030
Location
Marker shows the centre of Dade County; the queue data does not give exact sites.
Other requests in Dade County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem