ONSHORE WIND Β· SPPOnshore wind project GEN-2015-098, Wibaux County
Onshore wind project GEN-2015-098, Wibaux County is a 100 MW onshore wind request withdrawn in the SPP interconnection queue, in Wibaux County, Montana, connecting to WAPA.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2015 (completed)
- Withdrawn / abandonedMar 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2015-098
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- WAPA
- Connection point (POI)
- Dawson-Medora (Mingusville) 230kV
- Location
- Wibaux County, Montana
- Technology
- Wind: 100 MW
- Total requested
- 100 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 23 October 2015
- Proposed online date
- December 2017
- Withdrawn
- March 2019
Location
Marker shows the centre of Wibaux County; the queue data does not give exact sites.
Other requests in Wibaux County
- Onshore wind project GEN-2018-069, Wibaux CountyOnshore wind Β· 125 MW Β· agreement signed
- Wind + storage project GEN-2019-023, Wibaux CountyWind + storage Β· 110 MW Β· agreement signed
- Onshore wind project GI-1506, Wibaux CountyOnshore wind Β· 100 MW Β· in study
- Battery storage project GEN-2019-024, Wibaux CountyBattery storage Β· 50.0 MW Β· withdrawn
- Onshore wind project G994, Wibaux CountyOnshore wind Β· 19.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem