Onshore wind project G980, Hettinger County

Onshore wind project G980, Hettinger County is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Hettinger County, North Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2008 (completed)
  2. Withdrawn / abandonedMar 2010 (project stopped here)
  3. ConsentedMar 2010 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G980
Grid region
MISO (Midcontinent)
Connection point (POI)
New substation tapped into MDU 115 kV line at N46 36 53/W102 46 12
Location
Hettinger County, North Dakota
Technology
Wind: 60.0 MW
Total requested
60.0 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
10 March 2008
Agreement signed
26 March 2010
Proposed online date
December 2011
Withdrawn
March 2010

Location

Marker shows the centre of Hettinger County; the queue data does not give exact sites.

Power plants in North Dakota Β· Transmission lines in North Dakota

Other requests in Hettinger County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem