United States βΊ Grid βΊ Interconnection queues βΊ Washington
ONSHORE WIND Β· WESTOnshore wind project 857, Columbia County
Onshore wind project 857, Columbia County is a 7.8 MW onshore wind request withdrawn in the West interconnection queue, in Columbia County, Washington, connecting to PacifiCorp.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 857
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Talbot substation
- Location
- Columbia County, Washington
- Technology
- Wind: 7.8 MW
- Total requested
- 7.8 MW
- Service type
- Energy only (ERIS)
- Study phase
- WITHDRAWN BY CUSTOMER
- Queue status
- Withdrawn
- Entered queue
- 27 March 2017
- Proposed online date
- August 2019
Location
Marker shows the centre of Columbia County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Columbia County
- Onshore wind project G0294, Columbia CountyOnshore wind Β· 250 MW Β· agreement signed
- Onshore wind project G0295, Columbia CountyOnshore wind Β· 250 MW Β· agreement signed
- Solar + storage project G1086, Columbia CountySolar + storage Β· 359 MW Β· in study
- Solar + storage project G1070, Columbia CountySolar + storage Β· 220 MW Β· in study
- Solar project G0847, Columbia CountySolar Β· 150 MW Β· in study
- Lower Snake Phase 1Onshore wind Β· 250 MW Β· built
- Tucannon River Wind FarmOnshore wind Β· 250 MW Β· built
- Onshore wind project 122, Columbia CountyOnshore wind Β· 211 MW Β· built
- Hopkins Ridge WindOnshore wind Β· 150 MW Β· built
- Onshore wind project 856, Columbia CountyOnshore wind Β· 23.4 MW Β· built
- Hopkins Ridge AdditionOnshore wind Β· 7.0 MW Β· built
- Onshore wind project G0298, Columbia CountyOnshore wind Β· 300 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem