SOLAR Β· SOUTHEAST

Solar project 18

Solar project 18 is a 52.8 MW solar request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedJul 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
Madison
Location
Florida
Technology
Solar: 52.8 MW
Total requested
52.8 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: N/A; Status: Withdrawn by Customer on 07/27/2016
Queue status
Withdrawn
Entered queue
10 May 2016
Proposed online date
December 2020
Withdrawn
July 2016

Location

No county location in the queue data.

Power plants in Florida Β· Transmission lines in Florida

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem