SOLAR Β· WESTSolar project 24, Adams County
Solar project 24, Adams County is a 10.0 MW solar request withdrawn in the West interconnection queue, in Adams County, Washington, connecting to Avista Utilities.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2009 (completed)
- Withdrawn / abandonedNov 2009 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Avista Utilities
- Connection point (POI)
- Lee & Reynolds 115 kV Substation
- Location
- Adams County, Washington
- Technology
- Solar: 10.0 MW
- Total requested
- 10.0 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 28 October 2009
- Proposed online date
- December 2011
- Withdrawn
- November 2009
Location
Marker shows the centre of Adams County; the queue data does not give exact sites.
Power plants in Washington Β· Transmission lines in Washington
Other requests in Adams County
- Solar + storage project 59, Adams CountySolar + storage Β· 60.0 MW Β· agreement signed
- Solar project CS24-07, Adams CountySolar Β· 2.0 MW Β· agreement signed
- Solar project CS24-01, Adams CountySolar Β· 1.0 MW Β· agreement signed
- Solar + storage project CS25-09, Adams CountySolar + storage Β· 375 MW Β· in study
- Solar + storage project G0745, Adams CountySolar + storage Β· 200 MW Β· in study
- Solar project 73, Adams CountySolar Β· 100 MW Β· in study
- Solar project 81, Adams CountySolar Β· 94.0 MW Β· in study
- Solar project 67, Adams CountySolar Β· 80.0 MW Β· in study
- Solar project 85, Adams CountySolar Β· 5.0 MW Β· in study
- Solar project G1003, Adams CountySolar Β· 3.0 MW Β· in study
- Solar + storage project TCS-03, Adams CountySolar + storage Β· 80.0 MW Β· suspended
- Solar + storage project Q59, Adams CountySolar + storage Β· 60.0 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem