SOLAR + STORAGE Β· SPP

Solar + storage project GEN-2023-002, Butler County

Solar + storage project GEN-2023-002, Butler County is a 100 MW solar + storage request withdrawn in the SPP interconnection queue, in Butler County, Kansas, connecting to Evergy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2023 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2023-002
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
Evergy
Connection point (POI)
Rosalia 115 kV Substation
Location
Butler County, Kansas
Technology
Solar: 100 MW Β· Battery
Total requested
100 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
29 June 2023
Proposed online date
December 2026
Withdrawn
October 2023

Location

Marker shows the centre of Butler County; the queue data does not give exact sites.

Power plants in Kansas Β· Transmission lines in Kansas

Other requests in Butler County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem