United States βΊ Grid βΊ Interconnection queues βΊ Georgia
GAS Β· SOUTHEASTGas project IC-011, Walton County
Gas project IC-011, Walton County is a 620 MW gas request withdrawn in the Southeast interconnection queue, in Walton County, Georgia, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- Planning (completed)
- Withdrawn / abandonedFeb 2001 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-011
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- East Social Circle - Walnut Grove
- Location
- Walton County, Georgia
- Technology
- Gas: 620 MW
- Total requested
- 620 MW
- Service type
- Energy only (ERIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Withdrawn
- February 2001
Location
Marker shows the centre of Walton County; the queue data does not give exact sites.
Other requests in Walton County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem