SOLAR Β· SOUTHEAST

Solar project 606, Desoto County

Solar project 606, Desoto County is a 74.9 MW solar request withdrawn in the Southeast interconnection queue, in Desoto County, Florida, connecting to Florida Power & Light.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
606
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Florida Power & Light
Developer
FPL
Connection point (POI)
Desoto County
Location
Desoto County, Florida
Technology
Solar: 74.9 MW
Total requested
74.9 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
15 December 2023
Proposed online date
January 2030

Location

Marker shows the centre of Desoto County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Desoto County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem