Solar project 6

Solar project 6 is a 5.0 MW solar request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2012 (completed)
  2. Withdrawn / abandonedMar 2013 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
6
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
Sorrento
Location
Florida
Technology
Solar: 5.0 MW
Total requested
5.0 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: Feasibility; Status: Withdrawn by Customer on 3/18/2013
Queue status
Withdrawn
Entered queue
25 April 2012
Proposed online date
December 2011
Withdrawn
March 2013

Location

No county location in the queue data.