United States › Grid › Interconnection queues › Illinois

SOLAR · MISO

Pumpkin Patch

Pumpkin Patch is a 204 MW solar request in interconnection study in the MISO interconnection queue, in Greene County, Illinois, connecting to Hoosier Energy.

Queue statusIn planning
  1. PlanningQueued Nov 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
E0052
Grid region
MISO (Midcontinent)
Utility / transmission owner
Hoosier Energy
Developer
Hoosier Energy
Connection point (POI)
Roadhouse West Substation
Location
Greene County, Illinois
Technology
Solar: 204 MW
Total requested
204 MW
Service type
Network resource (NRIS)
Study phase
Request Status: Active; Post GIA Status: Not started
Queue status
Active
Entered queue
6 November 2025
Proposed online date
December 2028

Location

Marker shows the centre of Greene County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Greene County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem