ONSHORE WIND Β· WEST

Onshore wind project 6, Spokane County

Onshore wind project 6, Spokane County is a 150 MW onshore wind request withdrawn in the West interconnection queue, in Spokane County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2007 (completed)
  2. Withdrawn / abandonedApr 2009 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
6
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
8th & Fancher-Latah Jct. 115 kV line or Benewah- Shawnee 230 kV line near Fairfield
Location
Spokane County, Washington
Technology
Wind: 150 MW
Total requested
150 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
14 September 2007
Proposed online date
October 2009
Withdrawn
April 2009

Location

Marker shows the centre of Spokane County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Spokane County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem