United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project G297, Edmunds County
Onshore wind project G297, Edmunds County is a 39.0 MW onshore wind request withdrawn in the MISO interconnection queue, in Edmunds County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2003 (completed)
- Withdrawn / abandonedMay 2014 (project stopped here)
- ConsentedOct 2004 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G297
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Glenham Jct substation
- Location
- Edmunds County, South Dakota
- Technology
- Wind: 39.0 MW
- Total requested
- 39.0 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 12 February 2003
- Agreement signed
- 11 October 2004
- Proposed online date
- June 2008
- Withdrawn
- May 2014
Location
Marker shows the centre of Edmunds County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem