Onshore wind project H041, Lincoln County

Onshore wind project H041, Lincoln County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Lincoln County, Minnesota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2010 (completed)
  2. Withdrawn / abandonedAug 2013 (project stopped here)
  3. ConsentedAug 2013 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H041
Grid region
MISO (Midcontinent)
Connection point (POI)
Buffalo Ridge 115 kV Substation
Location
Lincoln County, Minnesota
Technology
Wind: 400 MW
Total requested
400 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
27 September 2010
Agreement signed
13 August 2013
Proposed online date
December 2011
Withdrawn
August 2013

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Minnesota Β· Transmission lines in Minnesota

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem