United States βΊ Grid βΊ Interconnection queues βΊ Minnesota
ONSHORE WIND Β· MISOOnshore wind project H041, Lincoln County
Onshore wind project H041, Lincoln County is a 400 MW onshore wind request withdrawn in the MISO interconnection queue, in Lincoln County, Minnesota.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2010 (completed)
- Withdrawn / abandonedAug 2013 (project stopped here)
- ConsentedAug 2013 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- H041
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Buffalo Ridge 115 kV Substation
- Location
- Lincoln County, Minnesota
- Technology
- Wind: 400 MW
- Total requested
- 400 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 27 September 2010
- Agreement signed
- 13 August 2013
- Proposed online date
- December 2011
- Withdrawn
- August 2013
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.
Power plants in Minnesota Β· Transmission lines in Minnesota
Other requests in Lincoln County
- Solar project J3961, Lincoln CountySolar Β· 245 MW Β· in study
- Gas project G005, Lincoln CountyGas Β· 29.0 MW Β· in study
- Onshore wind project J587, Lincoln CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project G349, Lincoln CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project J460, Lincoln CountyOnshore wind Β· 200 MW Β· built
- Onshore wind project J545, Lincoln CountyOnshore wind Β· 110 MW Β· built
- Onshore wind project G176, Lincoln CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project G586, Lincoln CountyOnshore wind Β· 30.0 MW Β· built
- Onshore wind project G443, Lincoln CountyOnshore wind Β· 7.0 MW Β· built
- Onshore wind project G444, Lincoln CountyOnshore wind Β· 5.0 MW Β· built
- Onshore wind project G241, Lincoln CountyOnshore wind Β· 2.0 MW Β· built
- Onshore wind project G073, Lincoln CountyOnshore wind Β· 1.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem