United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

SOLAR Β· WEST

Solar project 393, Golden Valley County

Solar project 393, Golden Valley County is a 20.0 MW solar request withdrawn in the West interconnection queue, in Golden Valley County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
393
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
Painted Robe 69kV Substation
Location
Golden Valley County, Montana
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
21 September 2020
Proposed online date
November 2021

Location

Marker shows the centre of Golden Valley County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Golden Valley County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem