United States β€Ί Grid β€Ί Interconnection queues β€Ί Montana

SOLAR Β· WEST

Solar project 420, Golden Valley County

Solar project 420, Golden Valley County is a 200 MW solar request withdrawn in the West interconnection queue, in Golden Valley County, Montana, connecting to NorthWestern Energy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
420
Grid region
West (non-ISO utilities)
Utility / transmission owner
NorthWestern Energy
Connection point (POI)
230 kV line between Broadview and Judith Gap South
Location
Golden Valley County, Montana
Technology
Solar: 200 MW
Total requested
200 MW
Service type
NRIS and ERIS
Study phase
System Impact Study 10/1/2022 System Impact Re-Study 4/12/2023 Facilities Study 4/12/2023
Queue status
Withdrawn
Entered queue
10 February 2022
Proposed online date
January 2025

Location

Marker shows the centre of Golden Valley County; the queue data does not give exact sites.

Power plants in Montana Β· Transmission lines in Montana

Other requests in Golden Valley County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem