United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

SOLAR + STORAGE Β· WEST

Solar + storage project 94, Pima County

Solar + storage project 94, Pima County is a 1,110 MW solar + storage request withdrawn in the West interconnection queue, in Pima County, Arizona, connecting to Tucson Electric Power Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
94
Grid region
West (non-ISO utilities)
Utility / transmission owner
Tucson Electric Power Company
Connection point (POI)
Pinal West 345kV Substation
Location
Pima County, Arizona
Technology
Solar: 555 MW Β· Battery: 555 MW
Total requested
1,110 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
11 June 2021
Proposed online date
April 2025

Location

Marker shows the centre of Pima County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Pima County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem