United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J490
Onshore wind project J490 is a 60.0 MW onshore wind request withdrawn in the MISO interconnection queue.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2015 (completed)
- Withdrawn / abandonedSep 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J490
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- The McIntosh Substation located 0.5 miles due North of the intersection of Route 31 and Route 12, located just off Route 31. The referenced intersection is 0.73 miles NE of the city center of McIntos
- Location
- South Dakota
- Technology
- Wind: 60.0 MW
- Total requested
- 60.0 MW
- Study phase
- GIA
- Queue status
- Withdrawn
- Entered queue
- 11 November 2015
- Proposed online date
- October 2017
- Withdrawn
- September 2017
Location
No county location in the queue data.
Power plants in South Dakota Β· Transmission lines in South Dakota