United States › Grid › Interconnection queues › Kentucky

SOLAR · SOUTHEAST

Solar project 642, Muhlenberg County

Solar project 642, Muhlenberg County is a 96.0 MW solar request in interconnection study in the Southeast interconnection queue, in Muhlenberg County, Kentucky, connecting to Tennessee Valley Authority.

Queue statusIn planning
  1. PlanningQueued Sep 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2033 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
642
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Tennessee Valley Authority
Connection point (POI)
TVA's Paradise CC 161-kV Substation
Location
Muhlenberg County, Kentucky
Technology
Solar: 96.0 MW
Total requested
96.0 MW
Study phase
Cluster Study
Queue status
Active
Entered queue
5 September 2024
Proposed online date
October 2033

Location

Marker shows the centre of Muhlenberg County; the queue data does not give exact sites.

Power plants in Kentucky · Transmission lines in Kentucky

Other requests in Muhlenberg County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem