United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Genoa Energy Storage

Genoa Energy Storage is a 252 MW battery storage request withdrawn in the CAISO interconnection queue, in Napa County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedSep 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1840
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Vaca-Lakeville #1 230 kV Line
Location
Napa County, California
Technology
Battery: 252 MW
Total requested
252 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
15 April 2021
Proposed online date
December 2031
Withdrawn
September 2025

Location

Marker shows the centre of Napa County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Napa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem