United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOGenoa Energy Storage
Genoa Energy Storage is a 252 MW battery storage request withdrawn in the CAISO interconnection queue, in Napa County, California, connecting to PGAE.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedSep 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1840
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- Vaca-Lakeville #1 230 kV Line
- Location
- Napa County, California
- Technology
- Battery: 252 MW
- Total requested
- 252 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 15 April 2021
- Proposed online date
- December 2031
- Withdrawn
- September 2025
Location
Marker shows the centre of Napa County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Napa County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem