United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AG2-136, Fayette County
Solar project AG2-136, Fayette County is a 120 MW solar request withdrawn in the PJM interconnection queue, in Fayette County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2021 (completed)
- Withdrawn / abandonedApr 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-136
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Lake Lynn-Lardin 138 kV
- Location
- Fayette County, Pennsylvania
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 4 February 2021
- Proposed online date
- December 2023
- Withdrawn
- April 2021
Location
Marker shows the centre of Fayette County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Fayette County
- Fayette Energy FacilityBattery storage Β· 20.0 MW Β· agreement signed
- Battery storage project AH2-103, Fayette CountyBattery storage Β· 200 MW Β· in study
- Poseidon StorageBattery storage Β· 80.0 MW Β· in study
- Lafayette StorageBattery storage Β· 60.0 MW Β· in study
- Poseidon Solar 1Solar Β· 40.0 MW Β· in study
- Poseidon Solar 2Solar Β· 25.0 MW Β· in study
- Solar project AI2-486, Fayette CountySolar Β· 14.0 MW Β· in study
- Ronco CT1, CT2, STGGas Β· 620 MW Β· built
- Gans 8 & 9Gas Β· 88.0 MW Β· built
- South Chestnut WFOnshore wind Β· 50.4 MW Β· built
- Fayette Energy FacilityGas Β· 45.0 MW Β· built
- Mill Run WFOnshore wind Β· 15.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem