JP Saylor and Associates is a 25.0 MW onshore wind request withdrawn in the West interconnection queue, in Curry County, Oregon, connecting to J P Saylor & Associates.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2000 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G17
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- J P Saylor & Associates
- Developer
- J P Saylor & Associates
- Connection point (POI)
- BPA's Fairview-Rogue 230 kV line in the vicinity of Curry County, OR
- Location
- Curry County, Oregon
- Technology
- Wind: 25.0 MW
- Total requested
- 25.0 MW
- Service type
- Energy only (ERIS)
- Queue status
- Withdrawn
- Entered queue
- 24 December 2000
- Proposed online date
- October 2001
Location
Marker shows the centre of Curry County; the queue data does not give exact sites.
Other requests in Curry County
- Onshore wind project G0972, Curry CountyOnshore wind · 300 MW · in study
- Battery storage project G0724, Curry CountyBattery storage · 280 MW · in study
- Onshore wind project G0997, Curry CountyOnshore wind · 300 MW · withdrawn
- Onshore wind project G0990, Curry CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project G0991, Curry CountyOnshore wind · 200 MW · withdrawn
- Clipper WindPowerOnshore wind · 53.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem