United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR Β· WEST

Solar project 20, Spokane County

Solar project 20, Spokane County is a 1.0 MW solar request withdrawn in the West interconnection queue, in Spokane County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2009 (completed)
  2. Withdrawn / abandonedFeb 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
East Farms Feeder 12F2 13 kV distribution line
Location
Spokane County, Washington
Technology
Solar: 1.0 MW
Total requested
1.0 MW
Service type
Other
Queue status
Withdrawn
Entered queue
13 July 2009
Proposed online date
December 2010
Withdrawn
February 2010

Location

Marker shows the centre of Spokane County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Spokane County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem