United States β€Ί Grid β€Ί Interconnection queues β€Ί Oklahoma

GAS Β· SPP

Gas project GEN-2016-018, Johnston County

Gas project GEN-2016-018, Johnston County is a 884 MW gas request withdrawn in the SPP interconnection queue, in Johnston County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2016 (completed)
  2. Withdrawn / abandonedAug 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2016-018
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Hugo - Sunnyside 345kV
Location
Johnston County, Oklahoma
Technology
Gas: 884 MW
Total requested
884 MW
Service type
NRIS and ERIS
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
28 March 2016
Proposed online date
June 2021
Withdrawn
August 2016

Location

Marker shows the centre of Johnston County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Johnston County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem