United States βΊ Grid βΊ Interconnection queues βΊ Georgia
BATTERY STORAGE Β· SOUTHEASTBattery storage project IC-820, Douglas County
Battery storage project IC-820, Douglas County is a 100 MW battery storage request withdrawn in the Southeast interconnection queue, in Douglas County, Georgia, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2019 (completed)
- Withdrawn / abandonedJul 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-820
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Villa Rica Primary TS 230 kV Bus
- Location
- Douglas County, Georgia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 8 October 2019
- Proposed online date
- July 2022
- Withdrawn
- July 2024
Location
Marker shows the centre of Douglas County; the queue data does not give exact sites.
Other requests in Douglas County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem