United States β€Ί Grid β€Ί Interconnection queues β€Ί Arizona

BATTERY STORAGE Β· WEST

Battery storage project Q435, Maricopa County

Battery storage project Q435, Maricopa County is a 180 MW battery storage request withdrawn in the West interconnection queue, in Maricopa County, Arizona, connecting to Arizona Public Service.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
Q435
Grid region
West (non-ISO utilities)
Utility / transmission owner
Arizona Public Service
Connection point (POI)
New (to be constructed) 69kV Sub adjacent to White Tanks 69kV Substation
Location
Maricopa County, Arizona
Technology
Battery: 180 MW
Total requested
180 MW
Service type
Network resource (NRIS)
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
30 September 2021
Proposed online date
November 2025

Location

Marker shows the centre of Maricopa County; the queue data does not give exact sites.

Power plants in Arizona Β· Transmission lines in Arizona

Other requests in Maricopa County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem