πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

ONSHORE WIND Β· WEST

Onshore wind project 23, Spokane County

Onshore wind project 23, Spokane County is a 121 MW onshore wind request withdrawn in the West interconnection queue, in Spokane County, Washington, connecting to Avista Utilities.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2009 (completed)
  2. Withdrawn / abandonedJun 2010 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23
Grid region
West (non-ISO utilities)
Utility / transmission owner
Avista Utilities
Connection point (POI)
Benewah-Shawnee 230 kV line near Latah
Location
Spokane County, Washington
Technology
Wind: 121 MW
Total requested
121 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
8 October 2009
Proposed online date
October 2012
Withdrawn
June 2010

Location

Marker shows the centre of Spokane County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Spokane County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem