United States β€Ί Grid β€Ί Interconnection queues β€Ί Indiana

BATTERY STORAGE Β· PJM

Battery storage project AG2-690, Sullivan County

Battery storage project AG2-690, Sullivan County is a 300 MW battery storage request withdrawn in the PJM interconnection queue, in Sullivan County, Indiana, connecting to AEP.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedJan 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-690
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Developer
Solar Prairie Holdco, LLC
Connection point (POI)
Sullivan - Rockport 765 kV
Location
Sullivan County, Indiana
Technology
Battery: 300 MW
Total requested
300 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
31 March 2021
Proposed online date
June 2024
Withdrawn
January 2025

Location

Marker shows the centre of Sullivan County; the queue data does not give exact sites.

Power plants in Indiana Β· Transmission lines in Indiana

Other requests in Sullivan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem