BATTERY STORAGE Β· SPP

Battery storage project GEN-2021-SR6, Woodward County

Battery storage project GEN-2021-SR6, Woodward County is a 80.0 MW battery storage request withdrawn in the SPP interconnection queue, in Woodward County, Oklahoma, connecting to OGE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2021 (completed)
  2. Withdrawn / abandonedOct 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2021-SR6
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
OGE
Connection point (POI)
Woodward EHV 345kV
Location
Woodward County, Oklahoma
Technology
Battery: 80.0 MW
Total requested
80.0 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
28 April 2021
Proposed online date
October 2023
Withdrawn
October 2021

Location

Marker shows the centre of Woodward County; the queue data does not give exact sites.

Power plants in Oklahoma Β· Transmission lines in Oklahoma

Other requests in Woodward County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem