HYDRO · NYISOLyons Falls Mill Repowering Project
Lyons Falls Mill Repowering Project is a 11.0 MW hydro request withdrawn in the NYISO interconnection queue, in Lewis County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2022 (completed)
- Withdrawn / abandonedApr 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1441
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Northbrook Lyons Falls LLC
- Connection point (POI)
- 115kV Taylorville-Boonville Line 6 via the Lyonsdale Hydro tap
- Location
- Lewis County, New York
- Technology
- Hydro: 11.0 MW
- Total requested
- 11.0 MW
- Queue status
- Withdrawn
- Entered queue
- 22 September 2022
- Withdrawn
- April 2023
Location
Marker shows the centre of Lewis County; the queue data does not give exact sites.
Other requests in Lewis County
- Sugar Maple SolarSolar · 125 MW · in study
- Flat Rock Wind PowerOnshore wind · 321 MW · built
- Flat Rock Wind PowerOnshore wind · 321 MW · built
- Number 3 Wind EnergyOnshore wind · 104 MW · built
- Number 3 Wind EnergyOnshore wind · 104 MW · built
- Copenhagen WindOnshore wind · 79.9 MW · built
- Copenhagen WindOnshore wind · 79.9 MW · built
- Roaring Brook WindOnshore wind · 79.7 MW · built
- Roaring Brook WindOnshore wind · 79.7 MW · built
- Chinook Energy Storage CenterBattery storage · 500 MW · withdrawn
- Antelope Energy Storage CenterBattery storage · 500 MW · withdrawn
- Chinook Energy Storage CenterBattery storage · 500 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem