United States βΊ Grid βΊ Interconnection queues βΊ New York
ONSHORE WIND Β· NYISORoaring Brook Wind
Roaring Brook Wind is a 79.7 MW onshore wind request built and operating in the NYISO interconnection queue, connecting to NM-NG.
Request details
- Queue ID
- 546
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- PPM Roaring Brook, LLC
- Connection point (POI)
- Chases Lake Substation 230kV
- Location
- New York
- Technology
- Wind: 79.7 MW
- Total requested
- 79.7 MW
- Study phase
- SIS, FS
- Queue status
- Operational
- Entered queue
- 19 May 2016
Location
Marker shows the centre of County; the queue data does not give exact sites.
Other requests in County
- Sugar Maple SolarSolar Β· 125 MW Β· in study
- Flat Rock Wind PowerOnshore wind Β· 321 MW Β· built
- Flat Rock Wind PowerOnshore wind Β· 321 MW Β· built
- Number 3 Wind EnergyOnshore wind Β· 104 MW Β· built
- Number 3 Wind EnergyOnshore wind Β· 104 MW Β· built
- Copenhagen WindOnshore wind Β· 79.9 MW Β· built
- Copenhagen WindOnshore wind Β· 79.9 MW Β· built
- Roaring Brook WindOnshore wind Β· 79.7 MW Β· built
- Chinook Energy Storage CenterBattery storage Β· 500 MW Β· withdrawn
- Antelope Energy Storage CenterBattery storage Β· 500 MW Β· withdrawn
- Chinook Energy Storage CenterBattery storage Β· 500 MW Β· withdrawn
- Antelope Energy Storage CenterBattery storage Β· 500 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem