United States › Grid › Interconnection queues › Pennsylvania
SOLAR · PJMASD Woodbury PA2 Solar I
ASD Woodbury PA2 Solar I is a 16.0 MW solar request withdrawn in the PJM interconnection queue, in Bedford County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2021 (completed)
- Withdrawn / abandonedJul 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AH1-162
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Developer
- ASD Woodbury PA2 Solar I LLC
- Connection point (POI)
- Curryville-RKB-Yellow Creek 23 kV
- Location
- Bedford County, Pennsylvania
- Technology
- Solar: 16.0 MW
- Total requested
- 16.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Withdrawn
- Entered queue
- 31 August 2021
- Proposed online date
- November 2023
- Withdrawn
- July 2025
Location
Marker shows the centre of Bedford County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Bedford County
- Solar project AI2-476, Bedford CountySolar · 5.8 MW · in study
- Solar project AI2-477, Bedford CountySolar · 5.8 MW · in study
- Solar project AI2-308, Bedford CountySolar · 4.4 MW · in study
- Onshore wind project Q04, Bedford CountyOnshore wind · 140 MW · withdrawn
- Solar + storage project AE1-128, Bedford CountySolar + storage · 120 MW · withdrawn
- Onshore wind project Q62, Bedford CountyOnshore wind · 100 MW · withdrawn
- Onshore wind project S49, Bedford CountyOnshore wind · 90.0 MW · withdrawn
- Solar project AH1-246, Bedford CountySolar · 80.0 MW · withdrawn
- Dunning Mountain WFOnshore wind · 76.0 MW · withdrawn
- Battery storage project AH2-229, Bedford CountyBattery storage · 50.0 MW · withdrawn
- Solar project AF2-339, Bedford CountySolar · 20.0 MW · withdrawn
- Solar project AF2-338, Bedford CountySolar · 20.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem