United States › Grid › Interconnection queues › Pennsylvania

BATTERY STORAGE · PJM

Bear Creek Energy Storage Facility

Bear Creek Energy Storage Facility is a 20.0 MW battery storage request withdrawn in the PJM interconnection queue, in Luzerne County, Pennsylvania, connecting to PPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2015 (completed)
  2. Withdrawn / abandonedJul 2024 (project stopped here)
  3. ConsentedApr 2019 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AB1-182
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PPL
Connection point (POI)
Bear Creek
Location
Luzerne County, Pennsylvania
Technology
Battery: 20.0 MW
Total requested
20.0 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
30 October 2015
Agreement signed
22 April 2019
Proposed online date
December 2022
Withdrawn
July 2024

Location

Marker shows the centre of Luzerne County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Luzerne County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem