Gas project 19 is a 655 MW gas request withdrawn in the Southeast interconnection queue, connecting to Seminole Electric Cooperative.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2016 (completed)
  2. Withdrawn / abandonedOct 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
19
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Seminole Electric Cooperative
Connection point (POI)
SGS Switchyard
Location
Florida
Technology
Gas: 655 MW
Total requested
655 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: System Impact; Status: Withdrawn by Customer on 10/06/2017
Queue status
Withdrawn
Entered queue
22 August 2016
Proposed online date
September 2020
Withdrawn
October 2017

Location

No county location in the queue data.