United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· MISOOnshore wind project J1341, Buchanan County
Onshore wind project J1341, Buchanan County is a 398 MW onshore wind request withdrawn in the MISO interconnection queue, in Buchanan County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J1341
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Hazleton 345kV Substation
- Location
- Buchanan County, Iowa
- Technology
- Wind: 398 MW
- Total requested
- 398 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 29 April 2019
- Proposed online date
- July 2022
- Withdrawn
- March 2021
Location
Marker shows the centre of Buchanan County; the queue data does not give exact sites.
Other requests in Buchanan County
- Battery storage project J3780, Buchanan CountyBattery storage Β· 200 MW Β· in study
- Battery storage project J2545, Buchanan CountyBattery storage Β· 200 MW Β· in study
- Other project G220, Buchanan CountyOther Β· 650 MW Β· withdrawn
- Gas project G181, Buchanan CountyGas Β· 600 MW Β· withdrawn
- Gas project G182, Buchanan CountyGas Β· 600 MW Β· withdrawn
- Other project G159, Buchanan CountyOther Β· 500 MW Β· withdrawn
- Onshore wind project J342, Buchanan CountyOnshore wind Β· 305 MW Β· withdrawn
- Other project G653d, Buchanan CountyOther Β· 23.3 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem